| Date |
Training |
Details |
| 1/2/2001 |
Quality Orientation |
ISO 9001 and TL9000 |
| 1/2/2001 |
Board Handling and
Electronic Assembly |
|
| 2/7/2001 |
Assembly Sheets |
|
| 2/15/2001 |
Inspection Methodology |
|
| 2/17/2001 |
BPA End User Training |
|
| 2/27/2001 |
Training and Qualification
- Final Assembly |
|
| 3/24/2001 |
Conforming and Noncomforming
Product |
|
| 3/28/2001 |
front Panel Inspection |
|
| 4/9/2001 |
Quality Systems TL
9000 Training |
|
| 4/16/2001 |
IPC-A-610 Rev C |
|
| 5/8/2001 |
Fiber Optic Fundamentals
and Inspection Cleaning |
|
| 5/9/2001 |
Fiber Optics Handling
and Routing |
|
| 5/31/2001 |
Root Cause Analysis |
|
| 6/5/2001 |
Training and Qualification
SMT Production Reflow Inspection HVL |
|
| 6/20/2001 |
Calibration Procedure |
|
| 6/28/2001 |
Training and Qualification
SMT Production Intial Assembly/Blakell |
|
| 8/1/2001 |
Component Prep- Initial
Assembly |
|
| 8/8/2001 |
Discoverer CBT |
|
| 8/10/2001 |
Final Assembly - 7.5/MFG
1004 |
Visual Inspection
of Press Fitted Parts |
| 9/15/2001 |
Control of NonComformity |
8.3/QUA/18 |
| 9/20/2001 |
BPA System |
7.5/MFG/1917 |
| 10/24/2001 |
Handling and Storage
Rev 10.15.01 |
|
| 2/20/2002 |
ISO 14001 Training |
|
| 3/20/2002 |
ISO 14001 Training |
|
| 3/22/2002 |
J Standards |
|
| 4/2/2002 |
Basic X-Ray Use |
|
| 4/8/2002 |
7.5/MFG/1003 - Review |
|
| 4/22/2002 |
Respectful Workplace |
|
| 5/7/2002 |
Rework Technician
- TQ Checklist |
|
| 5/13/2002 |
Back Safety |
|
| 8/26/2002 |
CIT Leader Training |
|
| 8/28/2002 |
7.5/MFG/1004 - Update
to Final Assembly |
|
| 9/18/2002 |
Trays vs Totes |
Proper board handling |
| 10/1/2002 |
7.5/MFG/1006 |
|
| 10/15/2002 |
Informational Training
on HR 6.2 |
|
| 11/27/2002 |
Board Handling |
|
| 12/6/2002 |
Control of QMS and
GMS Documentation |
4.2/QUA/08 |
| 12/6/2002 |
Creating, Updating and Approving Documentation |
4.2QUA/0801 |
| 12/16/2002 |
Use of Older Components
in SMT and Initial Assembly |
|
| 5/20/2003 |
Scrap Disposal and
Marking |
8.3/QUA/18 |
| 5/20/2003 |
ECO Implementation |
|
| 5/27/2003 |
Continuous Improvement |
8.5/QUA/17 |
| 7/1/2003 |
ESD procedure |
7.5/QUA/02 |
| 9/30/2003 |
Controlling Non-ESD
Safe Totes |
|
| 1/14/2004 |
Online Payroll |
|
| 1/28/2004 |
Core Value |
|
| 2/18/2004 |
Rail Adjustment |
|
| 3/4/2004 |
CPCI Racks |
Vissually Incpect
CPCI Connectors |
| 4/12/2004 |
Pin 1 Orientation |
Inspection Training |
| 5/26/2004 |
PCB Handling |
|
| 6/16/2004 |
Reflow Inspection |
Recording Defects |
| 6/20/2004 |
Pillarhouse/ SEHO |
recording Defects,
IPC-610c Class 2 |
| 6/23/2004 |
Training and qualification
- Piller House/ SEHO |
Selective Solder Machine |
| 9/29/2004 |
Buy off of reels,
trays and tubes |
Verfifying parts used
for fugi, GSM and HSP machines |
| 11/4/2004 |
Torque Specification |
|
| 11/10/2004 |
BPA training |
|
| 12/6/2004 |
Agile 7.5 Training |
|
| 12/16/2004 |
BOM Structuring |
|
| 2/2/2005 |
Motorola, IDEN, CIG,
SS7 |
|
| 5/12/2005 |
Red Cross |
Adult CPR and First
Aid |
| 5/19/2005 |
Hazardous Spill training |
MSDS, Spill Kits,
Proper Handling of Hazardous Material |
| 7/25/2005 |
Code of Business Conduct
and ethics Training |
|
| 7/28/2005 |
Nitrogen Safety Training |
|
| 8/3/2005 |
Fire Extinguisher
Training |
|
| 9/28/2005 |
Sexual Harassment
Prevention training |
|
| 5/31/2006 |
Red Cross |
CPR/AED Training |
| 6/7/2006 |
Ofice 2003 |
|
| 12/11/2006 |
Part Management Procudure |
7.3/MAT/37, TL 9000 |
| 1/26/2007 |
Internal Audit Process |
Procedure 8.2/QUA/03 |
| 4/29/2007 |
Agile 7.5 Product
Hold Process Change |
|
| 7/9/2007 |
Mechanical assembly
Guidelines |
Use of Asembly Drawings,
Torque Specification and tools usage, Use of LocTite |
| 8/11/2008 |
TL9000 and ISO 14001 |
|
| 9/25/2008 |
Oracle Purchase Requistions |
|