|
|
 |
|
A gathering of metalshapers in Robinson,IL.
|
 |
|
| Shed waiting for the roof to go on. |

|
| After a warming metalshaping break, it's back to work finishing the shed . Building inspectors next. |
1.24.04
|
 |
All pics from 1.24.04
| Checking out Randy's BIG!!! wheel. |

|
| 61" throat depth and several thousand pounds of structure. |
|
 |
 |
 |
|
1.24.04
| Flexible pattern making. |

|
| Roger is applying the second layer of tape for the flexible pattern for the doors. |
|
|
 |
 |
 |
|
1.24.04
| Further strecthing going on. |

|
|
|
|
|
1.24.04
| Phil working on his design project. |

|
1937-1940 D2 binders
|
|
|
 |